Home Page Recent News about Aztec Minera Division Water Division Petroleum Division Drilling and Logging Equipment Contact Details
 

Aztec Engineering Company Ltd

The
Petroleum Division's operations centre on a fully equipped Wilson Mogul 42 drilling rig and an Ideco H35 workover rig. Drilling depths to 2,000 metres and workover depths to 5,000 metres are possible.

Aztec Engineering Company LtdThe Division undertakes workovers and drilling of stratigraphic, exploration and production wells. These services are offered on a footage, turn-key or dayrate basis.

The rigs are comprehensively equipped with triplex pumps, cementing equipment, power swivels, blowout prevention equipment and mud systems allowing any type of hydrocarbon exploration to be undertaken.


Aztec Engineering Company Ltd

The Wilson Mogul rig
is comprehensively
equipped
for any type of
hydrocarbon exploration
.


Thai Language summary page